Anyone can asnwer these tasks covering the full requirements of the tasks? Scenario

Question

Anyone can asnwer these tasks covering the full requirements of the tasks?

Scenario

You are training to be a civil engineer. You have been asked to compile a project profile for the excavations, earthworks and groundwater control for a greenfield development, with granular sub-soil and a high-water table, and an RC pump station with a deep trench RC service duct.

Task 1 Single Storey Below Ground Reservoir Pumping Station

P1 Identify the earthworks activities that may be carried out when forming deep excavations and cuttings. This could be, for example, infrastructure works for public utility providers. Also identify the plant used, the challenges presented by various sub-soils and the support and falsework required to provide a safe working environment.

P2 Describe the methods of controlling groundwater. You must include a range of methods of groundwater control, for example sump pumping, dewatering and land drainage.

Task 2 Two Storey Basement Project with Framed Superstructure

P3 Describe the commonly used forms of substructure for commercial and industrial civil engineering projects. For example, outline the use of piles and rafts (sheet, contiguous and secant) and deep drainage techniques for use with service ducts and tunnels.

P4 Explain how drainage is integrated into substructures. This should build on the evidence for P3.

P5 Explain how public utilities are integrated into substructures. This should include deep reinforced concrete culverts and plant rooms, service ducting, cable trenching and service ducts. This should build on the evidence for P3 and P4.

P6 Describe the construction plant and equipment used to erect steel and concrete frames. Evidence should include images and/or drawings of the construction plant and equipment and a statement of the advantages and disadvantages of each.

P7 Explain the use of steel and concrete for framed superstructure construction. You should include the use of steel and concrete in the context of merits and de-merits including the levels of

skilled labour required, lifting and placement requirements and safe working access

HONDA
(3 )
Describe the commonly used form of substructure
For ex: Outline The use of piles and rafts
Sol?:. The commonly used form of substructure
are: Deep foundation
pile
foundation
Raft…
Engineering Technology